Visualizing all information related to temporary construction! Takamiya's BIM/CIM.
Reduce "wasted costs" arising from mistakes and rework! Towards further "safety" and "efficiency"!
■Visualization of Construction Stages Issues that become apparent during the construction phase, such as interference with the structure and identification of hazardous areas that were not clear during the design phase, can be "visualized" in advance by utilizing Takamiya's BIM. This allows for optimal planning and scheduling, reducing unnecessary costs due to rework or course corrections. ■Visualization of Material Quantities By using Takamiya's original features, calculating material quantities can be done easily with intuitive operations. By simply selecting the required area on the 3D model on the screen, material quantities can be calculated smoothly, making cost estimation effortless. ■Visualization of Process Management Information was previously shared using paper drawings, but when changes occurred, it was cumbersome to revise and distribute the drawings. With Takamiya's BIM, 3D models are centrally managed, allowing for real-time updates of information. Drawings that reflect the latest construction status enable preemptive identification and sharing of issues, reducing adjustments and revisions on-site. ■Smooth Quantity Calculation [A Unique Feature of Takamiya] By utilizing TAKAMIYA commands and ConnecT.oneQS, quantity calculations can be performed smoothly.
- Company:タカミヤ
- Price:Other